Well that's it the last job since the stretch in 2010/11 has been completed. Hurrahhhhhhhhh.
This is the before:
This is the after.
Nice eh certainly makes a difference and a job well done, but would I expect anything else from Paul?
We have had a few trips to Rugby in between all this work, me to the dentist and Paul back to the docs for the results of his blood tests, which were all clear but he now has to go to the hospital for a chest x-ray. Not too sure when this will be as at the moment we have about 6inches of snow in the marina although the roads were passable first thing.
Food delivery came on Wednesday so the dogs have enough to last a couple of months and us a couple of weeks not to sure if the alcohol will last that long though!!!!!
At least we are cosy here and looking at the weather it would appear we are due snow every day until Monday that should be fun, the dogs will love it.

1 comment:
The remodel is superb! Great job as usual Paul.
Stay warm and dry!
Jaq and Les
P.S. We've tried to leave comments on previous posts but the comment moderation wouldn't let us: after 6 tries to figure it out and re-writing the comments twice because the moderation scheme wipes the comment if you don't get the number and word sequence correct, we gave up. We do read and enjoy your posts though!
Post a Comment